北京格林奔能源科技有限公司
Enhancing the performance of our customers plants and equipment
提升我们客户电厂和设施的性能

3D扫描技术助力格林奔科的生物质耦合发电业务

发表时间:2020-12-03 18:41作者:格林奔科

news253aA.png

A large biomass-fuelled power plant is set to benefit from a host of additional safety features supplied and installed by the Greenbank Group.

The Derbyshire-based firm has been awarded a major contract to retrofit the UK plant with quick shut valves, isolation valves and associated chute modifications.

The contract covers the design, manufacture and installation of the equipment and as part of the project Greenbank has carried out a comprehensive survey of the site using state-of-the-art 3D scanning technology.

Charles Conroy, Greenbank Managing Director, explained: “We used specialist 3D scanners to create an accurate representation of the existing plant and our design proposals were then overlaid onto these ‘virtual’ plans, to show how they would look once installed.

“This technology, operated by our trained engineers using Greenbank’s own laser scanning equipment and software, will continue to be used throughout the installation process, generating graphic models of the components for review ahead of manufacture by Greenbank’s in-house team.”

The new chutes and valves are due to be delivered to the plant early in 2021 with installation taking place through the year, in line with the client’s requirements. When operational, the new valves will be capable of containing any safety critical incident within the conveying/storage equipment, providing safe isolation of the plant during maintenance.

“The work will be carried out during a series of short outages at the plant to minimise the impact on the operating regime,” Mr Conroy added.


分享到:
关于
关于我们 企业宗旨 资质证书
联系方式
产品
PfMaster Coalflo GCAM
VARB
GA
PSA
案例
一次风粉在线监测系统 燃煤电厂燃烧优化系统 燃煤耦合生物质直燃发电 电厂飞灰含碳量在线检测 锅炉蒸汽泄露在线检测 磨煤机煤粉细度在线检测
资讯
企业新闻 行业动态 常见问题
联系
公司地址
website qrcode

技术服务电话:
010-64405848
010-64405936
友情链接: